The 60m MRRV project has been tendered by the PCG.
It’s curious that the ABC slightly lower than 2.5 billion budget likely after talks with Austal.
60m, 25knots, aluminum hull with fenders, >14 days endurance, required to be PH built. Hopefully, start of many 60m MRRVs.