288 x 400GE ports in one box. Arista 7808 @ testing lab. 8 x 36 x 400G cards. Each cable is 2 x 400GE link for internal load tests. Power usage 11 kW standby, with load up to 17 kW. Realistic routing capacity: 50 Tbps Soon 2 x in production @ Singapore POP, CDN77 network.
Traffic to Afghanistan in the past 24+ hours has been zero. Afghan Telecom, Roshan, MTN and Etisalat have all disappeared from the global routing table.
1
1
23
CDN77 Server Infrastructure - Fresh Dataset - 389 data centers across all continents - 199 unique cities - 31 294 physical servers - 60-70 Tbps daily traffic peaks - 255 Tbps external edge network capacity - 1000+ BGP routers - 1000+ 400 Gbps ports in production - Traffic split is 90% IPv4 / 10% IPv6 - Data centers map @ img Never Ending & super creative fun with traffic routing! Local coverage of Africa has been our priority for the last 6 months. The result is in production!
16
6
175
+1.35 Tbps without notice to one EU country? Game updates never fail to surprise. Another fun day on the CDN77.com/network!
2
1
76
New 100G link between Lisbon and Johannesburg in operation. With branch to Equinix Lagos. 74 ms one way trip :)
4
14
146
Our fresh Europe and US backbone undersea interconnection capacity? 2.6 Tbps full duplex 5 physical routes via 5 x 400G, 6 x 100G links. 3 x WDC x PAR via DUNANT - 400G 1 x WDC x PAR via MAREA - 400 1 x NYC x PAR via AMITIE - 400G 6 x NYC x LON via EXA South/North - 100G 🚀
6
5
97
Zdenek Cendra retweeted
Today we are a company of 7 people, and I am pleased to announce that we have closed a Pre-seed Round worth €1M. Thank you, @zdendac, for your support. ❤️
1
3
17
132 ms round trip.
2
12
New 400G link from Miami to Sao Paulo is live! Via PCCS and BRUSA submarine cable system. Miami - San Juan (Puerto Rico) - Sao Paulo. Next upgrade? TYO x SGP via Asia Pacific Gateway (APG) and TYO x LAX via Unity submarine cable.
3
5
64
New 2 x 400G link from Paris to Ashburn is live! Via DUNANT submarine cable system. Our total EU x US capacity: 2.6 Tbps via 6 cable systems (Majority via 400G technology). Next upgrade in January: 2 x 400G between Bilbao and Ashburn via MAREA submarine cable system.
5
10
1
133
Listopad 23 bude první ziskový měsíc Rohlíku v Mnichově. Like!
1
1
187
CDN77 network team: odpolední quick update meetup před kanceláří. Pokud právě sedíš v kanceláři a nemáš zasedačku na zahrádce pod hruškou, mrkni na cdn77.jobs, always hledáme další tech super stars.
2
2
37
New cage of CDN77 servers in Los Angeles live. 3,6 Tbps active external internet capacity via only 400 Gbps links. Direct n x 100 Gbps backbone to Tokyo, Chicago and Dallas.
7
14
257